Caltrans has put out a draft version of its statewide rail plan. At first glance, it looks brilliant. They use ideas borrowed from the Swiss, such as pulse scheduling and integrated ticketing. Perhaps someday even 125mph electrified trains running on frequent schedules.
But dig deeper into the actual projects in the 20-year pipeline and it is disappointing. They will mostly throw money at existing Amtrak corridors that have to share track with freight. It is a huge waste of money — for example:
So after spending $324 million, we get a whopping 2 additional round-trips added to the schedule — in a corridor that will soon have faster and cheaper BART service.