The revised EIR for the SF-SJ segment has been published, although it hardly changed from the 2020 version. A few observations from both documents:
1. The existing 4th/King HSR station will get fare gates. Page 2-77 states: “The existing 4th and King Street Station would serve as the interim terminal station for the project until the DTX provides HSR access to the SFTC. Station improvements would include installing a booth for HSR ticketing and support services, adding HSR fare gates, and modifying existing tracks and platforms.”
2. Transfers between Caltrain and HSR at Millbrae will be done through the upper concourse. This is similar to the baldy designed transfer currently done between BART and Caltrain at Millbrae. There will be no cross-platform transfers between the express and local trains.
3. The upper concourse at Millbrae is extended all the way to El Camino Real, for no apparent reason. The southbound Caltrain is at-grade, and the west entrance is at-grade, but this diagram suggests these passengers will have to travel all the way up and down the concourse just to go from street to platform.

Leave a Reply